The Phase II of the Shapa offshore wind power project in Yangjiang, built by China Three Gorges Renewables (Group) Co., Ltd. (CTGR, ticker: SSE 600905) , went into full operation on November 27, delivering green and clean electricity to power the Guangdong-Hong Kong-Macao Greater Bay Area.
Located in the western sea of Shapa, the project has 62 units of 6.45-MW offshore wind turbines, with a total installed capacity of 400,000 kilowatts. It is expected to generate about 1.088 billion kWh annually, reducing carbon dioxide emissions by about 442,600 tons and saving about 346,000 tons of standard coal.